
Lots of Rinsing with water, left to dry overnight and came back the next day to Seal, turned the heating up, opened a couple of small windows front and back to allow for some Airflow and then started to apply 9 coats of Seal and Go with a Paint pad, this took all day, so quite a bit of waiting around, good time to catch up on my paperwork in the van in between sealer drying times.

Source: Terracotta Floor Restoration in Lancashire